Process

Field installation in 5 steps.

01
Site Survey

Sensor and panel placement on architectural plans.

02
Design

Zone, cable and ZCU schematics.

03
Manufacturing

Hardware preparation and testing.

04
Mounting

On-site sensor, panel and cabling installation.

05
Commissioning

Testing, calibration and operator training.

ParkSetup Approach

Advanced-technology domestic engineering.

As Oliptek, we develop advanced-technology solutions to enable more efficient use of parking resources and to help drivers park more safely, quickly and comfortably while saving time. To this end, we developed the "ParkSetup Ultrasonic Parking Guidance System". This system automatically directs vehicles to available spaces, reduces operating costs, eliminates the problem of finding a parking space and delivers maximum optimisation across car parks.

factory

100% Domestic Manufacturing

Our products are 100% domestically manufactured; all system components used in projects are produced at our factory under the Oliptek brand.

build

Easy Installation

Our easy-to-install products save both time and cost during deployment.

savings

Low Cost

Domestic manufacturing combined with the RS485 communication protocol keeps project costs low.

Field Application

Installation stages.

01 / Sensor
Sensor and LED Indicator Mounting

Rigid or EMT conduit runs — and trays where required — carrying sensor data and power lines are mounted to the car park ceiling. After sensors are addressed, they are mounted into the prepared conduits via junction boxes. Sensors are connected to patch panels on the main trunk via CAT6 cable.

02 / Cabling
Cabling

CAT6 cables carrying data and power lines — connecting sensors in series to zone units — are routed through the conduit channels. Cabling from zone units to the central control unit is then completed.

03 / Control
Control Units

Power lines for control units are pulled and sensors are powered via the control units. After sensors and control units are interconnected, zone tests are performed. Zone control units are finally connected to the master control device.

Auxiliary Components

Mounting apparatus.

We offer flexible installation options with mounting apparatus compatible with different ceiling and wall structures.

View mounting apparatus arrow_outward
Mounting apparatus